GTK1100
GTK1100

Grove GTK1100 powers up wind project in China

(01/10/2010) – The first Grove GTK1100 crane to arrive in Asia has completed its first jobs, helping to build major wind farm installations in Inner Mongolia, China. More...

GTK1100 is the only option for difficult demolition in Germany

(07/07/2009) – A German company considered several options for a challenging demolition project before selecting the Grove GTK1100 from Manitowoc as the only viable choice. More...

Grove GTK1100s tandem lift chimney section in Germany

(11/09/2009) – Two Grove GTK1100 specialist cranes from Manitowoc worked in tandem to erect a new chimney for a coke production facility in the SaarLorLux region of Germany. More...

Grove GTK1100 on course for 2007 launch

(01/29/2007) – Anticipation is building in the lifting industry as Manitowoc Crane Group’s GTK1100 moves closer to launch. More...

Grove GTK1100 debuts on wind power site in Germany

(12/12/2007) – Manitowoc’s Grove GTK1100 crane has completed its inaugural lift series at a jobsite in Germany. More...

Latest MCG crane offers new lifting technology

(09/25/2006) – Manitowoc Crane Group is launching a brand new technology for the world’s lifting industry. Named the Grove GTK1100, the crane utilizes a completely new concept in lifting engineering. More...

Specifications
Maximum capacity95 t (104.7 USt)
Maximum tip height143 m (469 ft)
Boom extension16,0 – 60,0 m 5-section TWIN-LOCK boom
Maximum tower height76,5 m (251 ft)
Min. working radius6 m (19.7 ft)
 
Power pack
EngineMercedes-Benz OM904LA, 4 cylinder diesel, water-cooled, turbo-charged, 130 kW (177 hp) at 2 200 min-1,
Fuel tank capacity400 l
Engine emissionEUROMOT/EPA/CARB (non road)
 
Carrier
Transport unitSemi-trailer (Scheuerle)
OutriggerFour single-stage 12,7 m beams
Outrigger base18 m x 18 m (59 ft X 59 ft)
 
Tower unit 
Tower19,4 m – 76,5 m six-section telescopic tower
Telescoping time2 400 seconds
Bracing4 spreaders; tensioning force 1000 kN
 
Superstructure
EngineMercedes-Benz OM906LA 6-cylinder diesel, water-cooled turbo charged, 190 kW (258 hp)
Fuel tank capacity29 l
Control systemECOS; connected to LMI and engine management system by CAN-BUS.
 Cable-connected controls or remote control
Slewing3 slewing gears
Boom elevation2 cylinders, boom angle from -1.2° to +82°

 

Options
Second hoist
3 m  heavy duty jib, 72 t capacity, 2 luffing angles
MEGALIFT 1500
GTK1100 in China
China windfarm project >Play
GTK1100 imakes first lift 2008
GTK1100 makes first lift >Play
GTK1100 animation
GTK1100 capabilities >Play
GTK1100 concept video
Concept for GTK1100 >Play